Front Grille Mould
The production process of the front grille mold mainly includes the following steps:

Raw material preparation: The mold production needs to prepare the corresponding raw materials, such as PP-T30 material with low linear expansion coefficient.

Gating system design: According to the modeling characteristics of the front grille, determine the number and position of the gates. Use a multi-point pouring scheme to ensure that the material fills the mold evenly.


Hot runner sequence valve design: In order to control the flow order of the molten plastic, the hot runner sequence valve is designed to ensure the stability of the injection process and the quality of the product.
Internal parting mechanism design: In order to avoid damage to the undercut area when the mold is opened, the internal parting mechanism is designed to ensure that the product can be demolded smoothly.
Quality Inspection: After production, the mold is quality inspected, including appearance inspection, dimension measurement and strength test, to ensure that it meets relevant standards and requirements.
Packaging and Transportation: The molds that pass the inspection are packaged to prevent damage during transportation.
Packaging & Delivery
Packaging Details:
1.Anti-rust oil
2.Plastic film
3.Wooden case
4.Or according to customer's requirement.
5.Port: Ningbo/Shanghai
6.Lead Time: 60 days

Order Manufacturing Process

If you are searching for Front Grille Mould, pls contact Shuncheng mould, we are Injection Molding Manufacturer.Shuncheng mould has various sorts of Front Grille Moulds for sale.
Hot Tags: front grille mould, China front grille mould manufacturers, suppliers, factory


